Structural Steel Fabrication

Structural Steel Fabrication
Manufacture and fabrication of light to heavy structural components and structures for the Oil and Gas, Mining and heavy industry sectores (materials include carbon and stainless steel).

click to enlarge

Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication
Structural steel fabrication

HITEC Welding manufacture and fabricate columns, trusses, frames, beams, walkways, stairs, platforms, grating, towers, pipe racks, supports and launders.

All associated items are fabricated in accordance with respective project specifications, Australian and International standards.

HITEC Welding designed, fabricated and erected its current workshop facility, purpose built for servicing heavy industries throughout Australia.

The manufacture and production process is maintained and monitored by the HITEC Welding SAI Global approved ISO 9001 Quality Management System.  

All non-destructive testing (NDT) is completed on location in accordance with the associated project specifications and respective standards.

All associated weld procedures, quality and traceability records, material certificates, associated drawings are compiled in the HITEC Welding manufactures data report.

Contact Hitec Welding Brisbane with your next project for the best results at the best price.

Includes the following projects:

Client: Santos GLNG

Date: 2016

Fabrication, assembly, wiring and testing of Lean Skid Separators, Lean Multi Skids and 2-Pipe Skids

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of 2 separator skids, including E&I installation and wiring on skid, and 2 RTU panels, complete with batteries and solar panels.

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of the remaining/balance skids for Roma West Phase 2A

Read more...

Client: Santos GLNG

Date: 2014

Manufacture of Coal Seam Gas Metering Skids

Read more...

Client: Santos GLNG

Date: 2014

Fabrication and supply of Multi Skids, off-skid piping and lease & flow line risers

Read more...

Client: Santos GLNG

Date: 2014

Fabrication of Separator skids, E&I Installation and Wiring, IFAT

Read more...

Client: Santos GLNG / Fluor

Date: 2014

RWP2A Santos/Fluor Roma (28 Skids) and Fairview (2 Skids) Integrated Separator Skids Fabrication, assembly, E&I Wiring, MCC & RTU panels and IFAT of Integrated separator skids

Read more...

Client: Santos GLNG

Date: 2014

Mechanical design and fabrication of 2-phase knock-out drum

Read more...

Client: Santos GLNG / Fluor

Date: 2013

Manufacture of Coal Seam Gas Surface Production Equipment.

Read more...

Client: Santos

Date: 2012

Manufacture of six coal seam gas production surface facility packages.

Read more...

Client: Fluor Santos GLNG Coal Seam Gas

Date: 2012

Design, procure and manufacture two gathering tank pump packages for the GLNG Project, FLUOR.

Read more...

Client: Fluor Santos GLNG

Date: 2012

Design and manufacture of HCS Flare and Knockout Drums for Fluor Santos GLNG.

Read more...

Client: Santos

Date: 2011

Manufacture of CSG Surface Production Equipment inclusive of piping and structural skids, installation and assembly of electrical and instrumentation pressure, temperature and flow transmitters.

Read more...

Client: Santos

Date: 2011

Manufacture and supply of associated mechanical piping skids for the SANTOS Roma underground injection facilities.

Read more...

Client: Santos

Date: 2010

Manufacture of associated surface facilities for the SANTOS FV340 Superseam Well Pad Project.

Read more...

Client: Santos

Date: 2010

Manufacture of associated surface facilities for the SANTOS FV338 ESP Well Project.

Read more...

Client: Santos

Date: 2010

Manufacture and supply of mechanical separator vessel packages for the new SANTOS 2010 design. A total of 6 vessel and associated piping packages were supplied.

Read more...

Client: ERM / Transfield Services

Date: 2009

Manufacture and installation of associated surface facilities for ERM / Transfield Services, project Braemer 2 Gas Pipeline - Daandine Metering Station.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2007

Manufacture and supply of four Fire Monitors for the Caltex Products Wharf, Brisbane Queensland.

Read more...

Client: Hitec Welding Brisbane

Date: 2007

Hitec Welding Brisbane moved to its own custom designed and purpose built workshop facility.

Read more...

Client: OK TEDI Mining

Date: 2007

Fabrication, rubber lining, surface treatment and packaging for export to PNG of approximately 200 launder units.

Read more...

Client: ABIGroup

Date: 2006

Fabrication of twenty structural props used in the tunnel ramp construction using 900mm diameter pipe.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

Fabrication of structural access walkways comprising handrails/ grating stairs access and ladders.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2004

Fabrication of structural access walkway spanning 70m comprising circular hollow sections.

Read more...

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...