Site Installation / Labour Hire

Site Installation / Labour Hire
HITEC welding provide on site installation, construction and maintenance services for the Oil and Gas and Mining industries and futher more can provide specialist labour and equipment hire for all maintenance, shut-down and project works.

click to enlarge

Site Installation / Labour Hire
Site Installation / Labour Hire
Site Installation / Labour Hire
Site Installation / Labour Hire

HITEC Welding provides a comprehensive installation service for manufactured products such as pipe spools, vessels and structural components (platforms, structures and stairs).

All aspects of the installation services are covered from mobilization, execution and demobilization.

HITEC Welding provide a customized/ tailored service package inclusive of project management, on site supervision, equipment and labor hire that will your suit project/ field requirements.

Site installation of instruments, valves, pumps, relief valves, blinds and skid mounted equipment inclusive of all associated trades (instrument, electrical, control logic, lifting, welding, fitting, cleaning, surveying, ground works, concreting, erection, tie-in's, depressurising).

Contact Hitec Welding Brisbane with your next project for the best results at the best price.

Includes the following projects:

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Maintenance repair of the Caltex Refinery Alkylation 7C6 Column.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Manufacture of a Steam Ring for Caltex Refinery, Queensland.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Hitec Welding Brisbane completed repairs to a refinery process exchanger.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2008

Fabrication of carbon steel shell 4000mm Long, internal hard face welding that includes two runs of stainless steel 309 and 304. Fabrication and installation of stainless steel baffle plates and nozzle.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2007

HITEC have performed ongoing work at CALTEX Lytton Refinery on modifications, repairs on projects, shutdowns, turnarounds and minor projects of piping and vessels.

Read more...

Client: ABIGroup

Date: 2006

Fabrication of twenty structural props used in the tunnel ramp construction using 900mm diameter pipe.

Read more...

Client: BP Refinery Bulwer Island Brisbane, QLD

Date: 2006

HITEC performed works associated with new BP Hydroblast Upgrade Project involving fabrication and installation of approximately 500m of 15mm to 150mm dia pipe.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

HITEC fabricated carbon steel pipe spools including various pipe supports. All spools were supplied painted and delivered within budget and time constraints.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

Fabrication of various pipe size pipe spools including surface treatment for Major Caltex Refinery QLD, Clean Fuels Project

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2004

Fabrication of structural access walkway spanning 70m comprising circular hollow sections.

Read more...

Client: INCITEC LTD., Gibson Island, Brisbane, QLD

Date: 2002

HITEC Welding completed the procurement of materials, site- fabrication and installation of carbon and stainless steel piping ranging in sizes 20mm to 1370mm diameter.

Read more...

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...