Non-Destructive Testing

Non-Destructive Testing
Non-Destructive testing services are provided at the HITEC Welding workshop facility allows for quick turnaround on supply of completed products.

click to enlarge

NDT RT Radiography Testing Pressure Pipeline Fabrication Equipment
NDT RT Radiography Testing Pressure Pipeline Fabrication Equipment
NDT Magnetic Particle Testing Structural Fabrication
NDT RT Radiography Testing Pressure Pipeline Fabrication
NDT Magnetic Particle Testing Pressure Pipeline Fabrication
NDT Material Hardness Testing Pressure Pipeline Fabrication
NDT PMI Positive Material Identification Pressure Pipeline Fabrication Niton XL2

Inspection Services Queensland work jointly with HITEC Welding to provide an efficient, economical and quick turnaround of NATA accredited Non-Destructive testing services for the mining, petrochemical, gas, power generation and aeronautical industries.

Non-Destructive testing services that are provided at the HITEC Welding workshop facility include the following;

  • Hydro-Testing
  • Weld visual inspection
  • Radiographic examination (gamma ray and x-ray)
  • Ultrasonic flaw and thickness testing
  • Dye Penetrant testing
  • Magnetic Particle examination
  • Positive material identification (PMI)
Contact Hitec Welding Brisbane with your next project for the best results at the best price.

Includes the following projects:

Client: Santos GLNG

Date: 2016

Fabrication, assembly, wiring and testing of Lean Skid Separators, Lean Multi Skids and 2-Pipe Skids

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of 2 separator skids, including E&I installation and wiring on skid, and 2 RTU panels, complete with batteries and solar panels.

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of the remaining/balance skids for Roma West Phase 2A

Read more...

Client: Santos GLNG / Fluor

Date: 2015

Fabrication of Low Point Drains, Gas & Water Risers and Transition Spools for Santos GLNG

Read more...

Client: Santos GLNG

Date: 2014

Manufacture of Coal Seam Gas Metering Skids

Read more...

Client: Santos GLNG

Date: 2014

Fabrication and supply of Multi Skids, off-skid piping and lease & flow line risers

Read more...

Client: Santos GLNG

Date: 2014

Fabrication of Separator skids, E&I Installation and Wiring, IFAT

Read more...

Client: Santos GLNG / Fluor

Date: 2014

RWP2A Santos/Fluor Roma (28 Skids) and Fairview (2 Skids) Integrated Separator Skids Fabrication, assembly, E&I Wiring, MCC & RTU panels and IFAT of Integrated separator skids

Read more...

Client: Santos GLNG

Date: 2014

Mechanical design and fabrication of 2-phase knock-out drum

Read more...

Client: Santos

Date: 2012

Manufacture of two coal seam gas production surface facility packages.

Read more...

Client: Santos GLNG / Fluor

Date: 2012

Design and manufacture risers, vents and transition spools - Fluor, SANTOS GLNG Coal Seam Gas

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Maintenance repair of the Caltex Refinery Alkylation 7C6 Column.

Read more...

Client: Santos

Date: 2011

Manufacture and supply of associated mechanical piping skids for the SANTOS Roma underground injection facilities.

Read more...

Client: Lihir Gold Limited (LGL)

Date: 2011

Supply of carbon steel process piping for the Lihir Island Gold Mine, Papua New Guinea, Million Ounce Plant Upgrade (MOPU) Project

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Hitec Welding Brisbane completed repairs to a refinery process exchanger.

Read more...

Client: Neumann Petroleum

Date: 2011

Supply of a pig launcher and receiver for Neumann Petroleum, Brisbane Queensland.

Read more...

Client: Santos

Date: 2010

Manufacture of associated surface facilities for the SANTOS FV340 Superseam Well Pad Project.

Read more...

Client: Santos

Date: 2009

Hitec Welding Brisbane were successfully awarded a contract to exclusively supply flow line risers (service water and Coal Seam Gas), flow line high point vents and low point drains for SANTOS, Queensland.

Read more...

Client: Santos

Date: 2009

Supply of SANTOS Compressor Station Fuel Gas skids

Read more...

Client: COPPERCO/ AUSENCO

Date: 2007

Fabrication of approximately 200 carbon steel and stainless steel pipe spools.

Read more...

Client: Western Corridor Pipeline Alliance

Date: 2007

Fabrication, hydro-testing, surface treatment and cement lining of suction and discharge pipe spools.

Read more...

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...