Maintenance and Repair

Maintenance and Repair
HITEC Welding offers comprehensive on-site and workshop repair services for the Oil and Gas and mining industries.

click to enlarge

Maintenance and Repair
Maintenance and Repair
Maintenance and Repair
Maintenance and Repair

Repairs to exchangers, vessels, supports and castings for various material specifications (alloy, carbon, stainless, cast iron) are all completed in accordance with the HITEC Welding SAI Global approved ISO 9001  Quality Management System.

All non-destructive testing (NDT) is completed on location in accordance with the associated project specifications and respective standards.

All associated weld procedures, quality and traceability records, material certificates, associated drawings are compiled in the HITEC Welding manufactures data report.

Contact Hitec Welding Brisbane with your next project for the best results at the best price.

Includes the following projects:

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Maintenance repair of the Caltex Refinery Alkylation 7C6 Column.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Manufacture of a Steam Ring for Caltex Refinery, Queensland.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Hitec Welding Brisbane completed repairs to a refinery process exchanger.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2008

Fabrication of carbon steel shell 4000mm Long, internal hard face welding that includes two runs of stainless steel 309 and 304. Fabrication and installation of stainless steel baffle plates and nozzle.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2007

HITEC have performed ongoing work at CALTEX Lytton Refinery on modifications, repairs on projects, shutdowns, turnarounds and minor projects of piping and vessels.

Read more...

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...