Electrical and Instrumentation Installation, Wiring & Testing

Electrical and Instrumentation Installation, Wiring & Testing
Modular packages manufactured by HITEC Welding incorporate various actuated valves, meters, temperature probes and transmitters, pressure transmitters, level transmitters.

click to enlarge

Junction Box installation, wiring & testing
Panel Installation & Wiring
Instrument Installation and Wiring
Instrument Installation and Wiring
Actuated Valves Installation & Wiring
Instrument Installation & Wiring
Actuated Valves Installation & Wiring

All associated instrumentation and electrical requirements are catered for by HITEC Welding and in addition factory acceptance testing is also provided for.

The large HITEC Welding workshop and the newly built temporary shelter facilities allow for packages to be tested with ease.

Mechanical packages are assembled and wired with all associated electrical and instrumentation components in readiness for factory acceptance testing of all packaged elements inclusive of generators, hydraulic power packs, MCC's, RTU's, Solar panels and batteries, pressure transmitters, temperature probes and transmitters, level transmitters, flow control actuated valves, level control actuated valves, shutdown actuated valves, magnetic flowmeters, multi-variable sensors, point to point testing and fluid circulation with associated pumps and motors.

Contact Hitec Welding Brisbane with your next project for the best results at the best price.

Includes the following projects:

Client: Santos GLNG

Date: 2016

Fabrication, assembly, wiring and testing of Lean Skid Separators, Lean Multi Skids and 2-Pipe Skids

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of 2 separator skids, including E&I installation and wiring on skid, and 2 RTU panels, complete with batteries and solar panels.

Read more...

Client: Santos GLNG

Date: 2015

Fabrication and assembly of the remaining/balance skids for Roma West Phase 2A

Read more...

Client: Santos GLNG

Date: 2014

Manufacture of Coal Seam Gas Metering Skids

Read more...

Client: Santos GLNG

Date: 2014

Fabrication and supply of Multi Skids, off-skid piping and lease & flow line risers

Read more...

Client: Santos GLNG

Date: 2014

Fabrication of Separator skids, E&I Installation and Wiring, IFAT

Read more...

Client: Santos GLNG / Fluor

Date: 2014

RWP2A Santos/Fluor Roma (28 Skids) and Fairview (2 Skids) Integrated Separator Skids Fabrication, assembly, E&I Wiring, MCC & RTU panels and IFAT of Integrated separator skids

Read more...

Client: Santos GLNG

Date: 2014

Mechanical design and fabrication of 2-phase knock-out drum

Read more...

Client: Santos GLNG / Fluor

Date: 2013

Manufacture of Coal Seam Gas Surface Production Equipment.

Read more...

Client: Santos

Date: 2012

Manufacture of two coal seam gas production surface facility packages.

Read more...

Client: Santos

Date: 2012

Manufacture of six coal seam gas production surface facility packages.

Read more...

Client: Fluor Santos GLNG Coal Seam Gas

Date: 2012

Design, procure and manufacture two gathering tank pump packages for the GLNG Project, FLUOR.

Read more...

Client: Fluor Santos GLNG

Date: 2012

Design and manufacture of HCS Flare and Knockout Drums for Fluor Santos GLNG.

Read more...

Client: Santos

Date: 2011

Manufacture and supply of associated mechanical piping skids for the SANTOS Roma underground injection facilities.

Read more...

Client: Santos

Date: 2010

Manufacture of associated surface facilities for the SANTOS FV338 ESP Well Project.

Read more...

Client: Santos

Date: 2010

Supply of the SANTOS Pickanjinnie Coal Seam Gas Seperator skid and associated mechanical skid packages.

Read more...

Client: Santos

Date: 2010

Manufacture and supply of mechanical separator vessel packages for the new SANTOS 2010 design. A total of 6 vessel and associated piping packages were supplied.

Read more...

Client: Santos

Date: 2010

Supply of the Santos Fairview Pad 90 coal seam gas separator skid, piping and associated mechanical skid packages.

Read more...

Client: ERM / Transfield Services

Date: 2009

Manufacture and installation of associated surface facilities for ERM / Transfield Services, project Braemer 2 Gas Pipeline - Daandine Metering Station.

Read more...

Client: BP Refinery Bulwer Island Brisbane, QLD

Date: 2006

HITEC performed works associated with new BP Hydroblast Upgrade Project involving fabrication and installation of approximately 500m of 15mm to 150mm dia pipe.

Read more...

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...