Mining

Mining
Hitec Welding Brisbane has provided and continues to provide services to the mining industry, both locally and internationally.

click to enlarge

Steel fabrication for the mining industry by Hitec Welding Brisbane
Hitec Welding Brisbane supplying fabrication to the mining industry
Surface treated pipe spools for mining industry
Carbon steel pipe spools for copper mine
Launder units for mining industry

Pipe spools, rubber lined launders and chutes, structural steel frames are some of the items manufactured and dispatched by Hitec Welding Brisbane.

Hitec Welding Brisbane were selected as suppliers of fabrication services for specific projects due to its continuous record of providing quality products in the most efficient and cost effective way. Some projects completed involved shipment of completed products to international destinations. Fabricated pressure pipe spools include carbon steel, stainless steel (304, 312, 316, 790 and 904).

Hitec Welding Brisbane have been involved with providing products to industries handling products such as Ammonia Nitrate, Fuel Gas, Gold Process Tailings, Bauxite, Aluminium, Hydrogen Sulfide and Hydrochloric Acids.  Each project provides a unique set of project requirements with respect to supply to Australian and International Standards.

Hitec Welding Brisbane will continue to service the mining industry and will ensure that clients continue to see the benefits of utilising the services of Hitec Welding Brisbane.

Contact us to see how Hitec Welding Brisbane can help with your next project.

Includes the following projects:

Client: OK TEDI Mining

Date: 2008

Fabrication and surface treatment of approximately 300 pipe spools including surface treatment. Pipe spools loaded on to shipping containers for export to PNG.

Read more...

Client: OK TEDI Mining

Date: 2007

Fabrication, rubber lining, surface treatment and packaging for export to PNG of approximately 200 launder units.

Read more...

Major Projects

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...