Refinery

Refinery
Hitec Welding Brisbane continues to provide services to both the petrochemical and minerals refining industries.

click to enlarge

Pressure pipeline for the refining industry
Fabrication for the refining industry in our Brisbane workshop
Refinery column replacement
Fabrication of refining steam ring

Services have varied from maintenance, new projects, repairs, minor and major plant shut-downs, labour and equipment hire and on site installation.

Hitec Welding Brisbane has proven time again that it is a leader in the supply of services to these industries and has an extensive knowledge base and work history to draw on.

Projects recently completed include modification and repairs to exchangers, columns and associated structural platforms and walkways.

Hitec Welding Brisbane acknowledges that there are more challenges with completing work on plant and equipment that has been in services but thrives on the fact this work is often very schedule driven and requires detailed attention from handling to providing a completed product.

Hitec Welding Brisbane will continue to service the Oil & Gas and Mining industries and ensures that clients continue to see the benefits of utilizing the services of Hitec Welding Brisbane.

Contact us to see how Hitec Welding Brisbane can help with your next project.

Includes the following projects:

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Maintenance repair of the Caltex Refinery Alkylation 7C6 Column.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Manufacture of a Steam Ring for Caltex Refinery, Queensland.

Read more...

Client: Caltex Refinery, Brisbane, QLD

Date: 2011

Hitec Welding Brisbane completed repairs to a refinery process exchanger.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2008

Fabrication of carbon steel shell 4000mm Long, internal hard face welding that includes two runs of stainless steel 309 and 304. Fabrication and installation of stainless steel baffle plates and nozzle.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2007

HITEC have performed ongoing work at CALTEX Lytton Refinery on modifications, repairs on projects, shutdowns, turnarounds and minor projects of piping and vessels.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2007

Manufacture and supply of four Fire Monitors for the Caltex Products Wharf, Brisbane Queensland.

Read more...

Client: BP Refinery Bulwer Island Brisbane, QLD

Date: 2006

HITEC performed works associated with new BP Hydroblast Upgrade Project involving fabrication and installation of approximately 500m of 15mm to 150mm dia pipe.

Read more...

Client: United Group Resources

Date: 2006

HITEC completed fabrication of approximately 2500 spools including carbon steel, stainless steel, victualic and pipe supports.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2006

HITEC provided fabrication and labour hire services - approximately 4 months.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

HITEC fabricated carbon steel pipe spools including various pipe supports. All spools were supplied painted and delivered within budget and time constraints.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

Fabrication of various pipe size pipe spools including surface treatment for Major Caltex Refinery QLD, Clean Fuels Project

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2005

Fabrication of structural access walkways comprising handrails/ grating stairs access and ladders.

Read more...

Client: TRANSFIELD SERVICES, Caltex Refinery, Brisbane, QLD

Date: 2004

Fabrication of structural access walkway spanning 70m comprising circular hollow sections.

Read more...

Major Projects

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...