Quality policy

Quality policy
HITEC WELDING PTY LTD performs material supply, shop detailing, fabrication, welding and installation of pressure piping and process plant equipment to meet or exceed all of our customer’s expectations with respect to quality, cost and delivery.

HTW-QA-0001-QUALITY-POLICY-REV-12.pdf

Click the link above to download the Hitec Welding quality policy


We manage and maintain a quality management process to assure, measure, record and document the requirements placed upon us. 

This process requires a commitment to the ongoing training of our people, the continued search for self improvement and, as a result, the achievement of target cost, work schedule, specification, nil rework and nil incidents or injuries to our infrastructure or employees. 

We recognise that every job we do is part of a collective effort and we will actively cooperate with our clients, our suppliers and all other parties that may be involved in the job we do. Hitec Welding believes that the best projects are those in which success is shared.

 

 

 

 

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane

Latest News

Mobile Container

Hitec Welding has two (2) mobile containers which can be utilized for site works.

Read more...

New HITEC Welding Temporary Shelter (iGLoo)

The “Igloo” for Electrical & Instrumentation (E&I) installation and wiring

Read more...