Clients

Clients
We assist clients both large and small to ensure their outcomes are achieved. These are a few of the companies we have worked with.

click to enlarge

Preparing fabrication project for shipping
Transporting client project from the Hitec Welding Brisbane workshop
Drain and riser assemblies fabricated for Santos
Underground injection facility for Santos
Coal seam gas production equipment for Santos
  • ABI Group
  • Aker Kvaerner
  • Alcan
  • Ausenco
  • Austcast
  • Bechtel
  • BP Refinery QLD
  • Callidus
  • Caltex Refinery QLD
  • Camalco
  • CB&I
  • Central Diesel
  • Chevron
  • Contract Resources
  • Downer Engineering
  • Enerflex
  • Fluor
  • FYFE
  • GHD
  • Helitech
  • Hitachi
  • iGas
  • iPipe
  • Incitec
  • John Holland
  • Leighton
  • Lihir Services Australia
  • Lucas
  • McConnel Dowell
  • Mitchell
  • Monadelphous
  • Murphy Pipe & Civil
  • Nandah Alliance
  • OK Tedi Minning
  • Orica
  • Origin
  • Pearl Street
  • Powerflo
  • QGC
  • RIO Tinto Aluminium
  • ROCHE
  • SANTOS GLNG
  • Savcor
  • Shedden UHD
  • Stork Cooperheat Australia
  • Sun Engineering
  • Tenix
  • Terex Jaques
  • Theiss Sedgman
  • Transfield Services
  • UGR -United Group Resources
  • Walton Construction
  • Walz Construction
  • WorleyParsons

Contact us to discover how Hitec Welding Brisbane can deliver high pressure pipeline fabrication, steel fabrication, consulting, design, project management and a range of other services.

Newsletter

Sign up for our newsletter

Directors' Update

HITEC Welding enters 2013 with a strong portfolio of works and the continuation of established contracts. 

The focus on completing services safely and of the highest quality will remain our priority.

At the end of 2012 HITEC Welding project, engineering and administration staff moved into our newly built office facility.

From 2013 to 2016, HITEC Welding has done major projects for Santos GLNG including the Roma West Phase 2A and 2B which totals around 321 skids. HITEC also has been awarded with other Santos projects (Fairview Infill, CS3 Metering Skids, Scotia Skids, Warrinilla Knock-out Drum) which made HITEC very busy for the past 3 years.

HITEC Welding has also developed its Brisbane facility by constructing additional workshop spaces (Temporary Igloo Shelter) effectively doubling throughput and capability. Paving and asphalt works for the lay down area has been completed in 2013 and 2015 respectively. Road works on the School Road has also been done on the third quarter of 2015.

HITEC Welding wishes you every success for 2016.

Joe Lewandowski, Director
Hitec Welding Brisbane